Yucca Mountain Nuclear Waste Repository - Yucca Mountain
The Yucca Mountain Nuclear Waste Repository, as designated by the Nuclear Waste Policy Act amendments of 1987, is to be a deep geological repository storage facility for spent nuclear fuel and other high level radioactive waste in the United States. The site is located on federal land adjacent to the Nevada Test Site in Nye County, Nevada, about 80Â mi (130Â km) northwest of the Las Vegas Valley.
The project was approved in 2002 by the United States Congress, but Federal funding for the site ended in 2011 under the Obama Administration via amendment to the Department of Defense and Full-Year Continuing Appropriations Act, passed on April 14, 2011. The project has had many difficulties and was highly contested by the general public, the Western Shoshone peoples, and many politicians. The Government Accountability Office stated that the closure was for political, not technical or safety reasons.
This leaves the US government and utilities without any designated long-term storage site for the high-level radioactive waste stored on-site at various nuclear facilities around the country. The US government disposes of transuranic waste at WIPP in New Mexico, in rooms 2,150 feet (660Â m) underground.
The Department of Energy (DOE) is reviewing other options for a high-level waste repository and the Blue Ribbon Commission on America's Nuclear Future, established by the Secretary of Energy, released its final report in January 2012. It expressed urgency to find a consolidated, geological repository, and said that any future facility should be developed by a new independent organization with direct access to the Nuclear Waste Fund, which is not subject to political and financial control as is the cabinet department of the Department of Energy. In the meantime, most nuclear power plants in the United States have resorted to the indefinite on-site dry cask storage of waste in nearly impervious steel and concrete casks.
Introduction
Spent nuclear fuel is the radioactive by-product of electricity generation at commercial nuclear power plants, and high-level radioactive waste is the by-product from reprocessing spent fuel to produce fissile material for nuclear weapons. In 1982, the United States Congress established a national policy to solve the problem of nuclear waste disposal. This policy is a federal law called the Nuclear Waste Policy Act, which made the DOE responsible for finding a site, building, and operating an underground disposal facility called a geologic repository. The recommendation to use a geologic repository dates back to 1957 when the National Academy of Sciences recommended that the best means of protecting the environment and public health and safety would be to dispose of the waste in rock deep underground.
The DOE began studying Yucca Mountain in 1978 to determine whether it would be suitable for the nation's first long-term geologic repository for over 70,000 metric tons (69,000 long tons; 77,000 short tons) (150 million pounds) of spent nuclear fuel and high-level radioactive waste as of 2015 stored at 121 sites around the nation. An estimated 10,000 metric tons (9,800 long tons; 11,000 short tons) of the waste would be from America's military nuclear programs. On December 19, 1984, the DOE selected ten locations in six states for consideration as potential repository sites, based on data collected for nearly ten years. The ten sites were studied and results of these preliminary studies were reported in 1985. Based on these reports, President Ronald Reagan approved three sites for intensive scientific study called site characterization. The three sites were Hanford, Washington; Deaf Smith County, Texas; and Yucca Mountain. In 1987, Congress amended the Nuclear Waste Policy Act and directed DOE to study only Yucca Mountain, which is located within a former nuclear test site. The Act provided that if during site characterization the Yucca Mountain location was found unsuitable, studies would be stopped immediately. This option expired when the site was actually recommended by the President. On July 23, 2002, President George W. Bush signed House Joint Resolution 87, (Pub.L. 107â"200) allowing the DOE to take the next step in establishing a safe repository in which to store the country's nuclear waste. The DOE was to begin accepting spent fuel at the Yucca Mountain Repository by January 31, 1998 but did not do so because of a series of delays due to legal challenges, concerns over how to transport nuclear waste to the facility, and political pressures resulting in underfunding of the construction.
On July 18, 2006 the DOE proposed March 31, 2017 as the date to open the facility and begin accepting waste based on full funding. On September 8, 2006 Ward (Edward) Sproat, a nuclear industry executive formerly of PECO energy in Pennsylvania, was nominated by President Bush to lead the Yucca Mountain Project. Following the 2006 mid-term Congressional elections, Democratic Nevada Senator Harry Reid, a longtime opponent of the repository, became the Senate Majority Leader, putting him in a position to greatly affect the future of the project. Reid has said that he would continue to work to block completion of the project, and is quoted as having said: "Yucca Mountain is dead. It'll never happen."
In the 2008 Omnibus Spending Bill, the Yucca Mountain Project's budget was reduced to $390 million. The project was able to reallocate resources and delay transportation expenditures to complete the License Application for submission on June 3, 2008. Lacking an operating repository, the federal government owes utility companies somewhere between $300 and $500 million per year in compensation for failing to comply with the contract it signed to take the spent nuclear fuel by 1998.
During his 2008 presidential campaign, Barack Obama promised to abandon the Yucca Mountain project. As a result, Senator Reid moved the Nevada primary to help Obama's campaign. After his election, the Nuclear Regulatory Commission told Obama he did not have the ability to do so. On April 23, 2009, Lindsey Graham (R-South Carolina) and eight other senators introduced legislation to provide "rebates" from a $30 billion federally managed fund into which nuclear power plants had been paying, so as to refund all collected funds if the project was in fact cancelled by Congress.
In November 2013, in response to a lawsuit filed by the National Association of Regulatory Utility Commissioners and the Nuclear Energy Institute, the US court of appeals ruled that nuclear utilities may stop paying into the nuclear waste recovery fund until either the DOE follows the Nuclear Waste Policy Act, which designates Yucca Mountain as the repository, or Congress changes the law. The fee ended May 16, 2014.
The facility
The purpose of the Yucca Mountain project is to comply with the Nuclear Waste Policy Act of 1982 and develop a national site for spent nuclear fuel and high-level radioactive waste storage. The management and operating contractor as of April 1, 2009 for the project is USA Repository Services, a consortium of government contractors, URS Corporation, Shaw Corporation and Areva Federal Services LLC. After the layoff of 800 employees on March 31, 2009, about 100 employees remained on the project until all technical staff were laid off by the end of FY 2010 due to zero funding in the 2011 budget for the Office of Civilian Radioactive Waste Management. Sandia National Laboratories had the responsibility for post closure analysis and ensuring compliance with the NWPA. The main tunnel of the Exploratory Studies Facility is U-shaped, 5Â mi (8.0Â km) long and 25Â ft (7.6Â m) wide. There are also several cathedral-like alcoves that branch from the main tunnel. It is in these alcoves that mos t of the scientific experiments were conducted. The emplacement drifts (smaller diameter tunnels branching off the main tunnel) where waste would have been stored were not constructed since they required a construction authorization by the Nuclear Regulatory Commission. The repository has a statutory limit of 77,000 metric tons (85,000 short tons). To store this amount of waste would have required 40 miles (64Â km) of tunnels. The Nuclear Waste Policy Act further limits the capacity of the repository to 63,000 metric tons (62,000 long tons; 69,000 short tons) of initial heavy metal in commercial spent fuel. The 104 U.S. commercial reactors currently operating will produce this quantity of spent fuel by 2014, assuming that the spent fuel rods are not reprocessed.
Currently, the US has no civil reprocessing plant.
By 2008, Yucca Mountain was one of the most studied pieces of geology in the world; between geologic studies and materials science the United States had invested US$9 billion on the project. This site studied by the Nevada Bureau of Mines and Geology (NBMG) differs substantially from other potential repositories due to the finding of natural analogues of nuclear material that are currently being studied. The DOE estimates that it has over 100 million U.S. gallons of highly radioactive waste and 2,500 metric tons (2,800 short tons) of spent fuel from the production of nuclear weapons and from research activities in temporary storage. The cost of the facility is being paid for by a combination of a tax on each kilowatt hour of nuclear power and by the taxpayers for disposal of weapons and naval nuclear waste. Based on the 2001 cost estimate, approximately 73 percent is funded from consumers of nuclear-powered electricity and 27 percent by the taxpayers. The Total Sys tem Life Cycle Cost presented to Congress on July 15, 2008 by Director Sproat was $90 billion. This cost, could not be compared to previous estimates since it included a repository capacity about twice as large as previously estimated over a much longer period of time (100 years vs 30 years). Additionally, the cost of the project continued to escalate because of insufficient funding to most efficiently move forward and complete the project. By 2007, the DOE announced it was seeking to double the size of the Yucca Mountain repository to a capacity of 135,000 metric tons (149,000 short tons), or 300 million pounds.
The tunnel boring machine (TBM) that excavated the main tunnel cost $13Â million and was 400Â ft (120Â m) in length when in operation. It now sits at its exit point at the South Portal (south entrance) of the facility. The short side tunnel alcoves were excavated using explosives.
Opposition
The DOE was scheduled to begin accepting spent fuel at the Yucca Mountain repository by January 31, 1998. As of 2010, years after this deadline, the future status of the repository at Yucca Mountain was still unknown due to on-going litigation, and opposition by Senator Harry Reid.
Because of construction delays, a number of nuclear power plants in the United States have resorted to dry cask storage of waste on-site indefinitely in nearly impervious steel and concrete casks.
The project is widely opposed in Nevada and is a hotly debated national topic. A two-thirds majority of Nevadans feel it is unfair for their state to have to store nuclear waste when there are no nuclear power plants in Nevada Many Nevadans' opposition stemmed from the so-called "Screw Nevada Bill," the 1987 legislation halting study of Hanford and Texas as potential sites for the waste before conclusions could be made. The local county in which the proposed facility is located, Nye County, supports the development of the repository as do six adjoining counties.
One point of concern has been the standard of radiation emission from 10,000 years to 1,000,000 years into the future. On August 9, 2005, the United States Environmental Protection Agency proposed a limit of 350Â millirem per year for that period. In October 2007, the DOE issued a draft of the Supplemental Environmental Impact Statement in which it shows that for the first 10,000Â years mean public dose would be 0.24Â mrem/year and that thereafter to 1,000,000 years the median public dose would be 0.98Â mrem/year, both of which are substantially below the proposed EPA limit. For comparison, a hip x-ray results in a dose around 83 mrem and a CT head or chest scan results in around 1,110 mrem. Annually, in the United States, an individual's doses from background radiation is about 350 mrem, although some places get more than twice that.
On February 12, 2002, U.S. Secretary of Energy Spencer Abraham made the decision that this site was suitable to be the nation's nuclear repository. The governor of Nevada had 90Â days to object and did so. However, the United States Congress overrode the objection. If the governor's objection had stood the project would have been abandoned and a new site chosen. In August 2004, the repository became an election issue, when Senator John Kerry(D) said that he would abandon the plans if elected.
In March 2005, the Energy and Interior departments revealed that several U.S. Geological Survey hydrologists had exchanged e-mails discussing possible falsification of quality assurance documents on water infiltration research. On February 17, 2006, the DOEâs Office of Civilian Radioactive Waste Management (OCRWM) released a report confirming the technical soundness of infiltration modeling work performed by U.S. Geological Survey (USGS) employees. In March 2006, the U.S. Senate Committee on Environment and Public Works Majority Staff issued a 25-page white paper "Yucca Mountain: The Most Studied Real Estate on the Planet." The conclusions were:
- Extensive studies consistently show Yucca Mountain to be a sound site for nuclear waste disposal
- The cost of not moving forward is extremely high
- Nuclear waste disposal capability is an environmental imperative
- Nuclear waste disposal capability supports national security
- Demand for new nuclear plants also demands disposal capability
On January 18, 2006, DOE OCRWM announced that it would designate Sandia National Laboratories as its lead laboratory to integrate repository science work for the Yucca Mountain Project. "We believe that establishing Sandia as our lead laboratory is an important step in our new path forward. The independent, expert review that the scientists at Sandia will perform will help ensure that the technical and scientific basis for the Yucca Mountain repository is without question," OCRWMâs Acting Director Paul Golan said. "Sandia has unique experience in managing scientific investigations in support of a federally licensed geologic disposal facility, having served in that role as the scientific advisor to the Waste Isolation Pilot Plant in Carlsbad, New Mexico." Sandia began acting as the lead laboratory on October 1, 2006.
Because of questions raised by the State of Nevada and Congressional members about the quality of the science behind Yucca Mountain, the DOE announced on March 31, 2006 the selection of Oak Ridge Associated Universities/Oak Ridge Institute for Science and Education (a not-for-profit consortium that includes 96 doctoral degree-granting institutions and 11 associate member universities) to provide expert reviews of scientific and technical work on the Yucca Mountain Project. DOE stated that the Yucca Mountain Project "will be based on sound science. By bringing in Oak Ridge for review of technical work, DOE will seek to present a high level of expertise and credibility as they move the project forward... This award gives DOE access to academic and research institutions to help DOE meet their mission and legal obligation to license, construct, and open Yucca Mountain as the nationâs repository for spent nuclear fuel."
There was significant public and political opposition to the Yucca Mountain Nuclear Waste Repository project in Nevada. An attempt was made to push ahead with the project and override this opposition. But for large projects which would take decades to complete, there is every chance that sustained local opposition will prevail, and this happened with the Yucca Mountain project. Successful nuclear waste storage siting efforts in Scandinavia have involved local communities in the decision-making process and given them a veto at each stage, but this did not happen with Yucca Mountain. Local communities at potential storage and repository sites "should have early and continued involvement in the process, including funding that would allow them to retain technical experts".
On March 5, 2009, Energy Secretary Steven Chu reiterated in a Senate hearing that the Yucca Mountain site was no longer considered an option for storing reactor waste.
On March 3, 2010, the DOE filed a motion with the NRC to withdraw its license application, however multiple lawsuits to stop this action have been filed by states, counties, and individuals across the country as being unauthorized by the NWPA.
The costly nuclear accident in 2014 at New Mexico's Waste Isolation Pilot Plant in which a nuclear waste container exploded, has caused doubt that it could serve as an alternative for Yucca.
Radiation standards
Original standard
The United States Environmental Protection Agency (EPA) established its Yucca Mountain standards in June 2001. The storage standard set a dose limit of 15 millirem per year for the public outside the Yucca Mountain site. The disposal standards consisted of three components: an individual dose standard, a standard evaluating the impacts of human intrusion into the repository, and a groundwater protection standard. The individual-protection and human intrusion standards set a limit of 15 millirem per year to a reasonably maximally exposed individual, who would be among the most highly exposed members of the public. The groundwater protection standard is consistent with EPA's Safe Drinking Water Act standards, which the Agency applies in many situations as a pollution prevention measure. The disposal standards were to apply for a period of 10,000 years after the facility is closed. Dose assessments were to continue beyond 10,000 years and be placed in DOE's Environmen tal Impact Statement, but were not subject to a compliance standard. The 10,000 year period for compliance assessment is consistent with EPA's generally applicable standards developed under the Nuclear Waste Policy Act. It also reflects international guidance regarding the level of confidence that can be placed in numerical projections over very long periods of time.
Inconsistent standards
Shortly after the EPA first established these standards in 2001, the nuclear industry, several environmental and public interest groups, and the State of Nevada challenged the standards in court. In July 2004, the Court of Appeals for the District of Columbia Circuit found in favor of the Agency on all counts except one: the 10,000 year regulatory time frame. The court ruled that EPAâs 10,000-year compliance period for isolation of radioactive waste was not consistent with National Academy of Sciences (NAS) recommendations and was too short. The NAS report had recommended standards be set for the time of peak risk, which might approach a period of one million years. By limiting the compliance time to 10,000 years, EPA did not respect a statutory requirement that it develop standards consistent with NAS recommendations.
EPA's rule
EPA published in the Federal Register a final rule in 2009. The new rule limits radiation doses from Yucca Mountain for up to 1,000,000 years after it closes. Within that regulatory time frame, the EPA has two dose standards that would apply based on the number of years from the time the facility is closed.
For the first 10,000 years, the EPA would retain the 2001 final ruleâs dose limit of 15Â millirem per year. This is protection at the level of the most stringent radiation regulations in the U.S. today. From 10,000 to one million years, EPA established a dose limit of 100Â millirem per year. EPA's rule requires the Department of Energy to show that Yucca Mountain can safely contain wastes, considering the effects of earthquakes, volcanic activity, climate change, and container corrosion, over one million years. The current analysis indicates that the repository will cause less than 1Â mrem/year public dose through 1,000,000 years.
Geology
The formation that makes up Yucca Mountain was created by several large eruptions from a caldera volcano and is composed of alternating layers of ignimbrite (welded tuff), non-welded tuff, and semi-welded tuff. The tuff surround the burial sites is expected to protect human health as it provides a natural barrier to the radiation. It lies along the transition between the Mojave and the Great Basin Deserts.
The volcanic tuff at Yucca Mountain is appreciably fractured and movement of water through an aquifer below the waste repository is primarily through fractures. While the fractures are usually confined to individual layers of tuff, the faults extend from the planned storage area all the way to the water table 600 to 1,500Â ft (180 to 460Â m) below the surface. Future water transport from the surface to waste containers is likely to be dominated by fractures. There is evidence that surface water has been transported down through the 700Â ft (210Â m) of overburden to the exploratory tunnel at Yucca Mountain in less than 50 years.
Some site opponents assert that, after the predicted containment failure of the waste containers, these cracks may provide a route for movement of radioactive waste that dissolves in the water flowing downward from the desert surface. Officials state that the waste containers will be stored in such a way as to minimize or even nearly eliminate this possibility.
The area around Yucca Mountain received much more rain in the geologic past and the water table was consequently much higher than it is today, though well below the level of the repository.
Earthquakes
Nevada ranks fourth in the nation for current seismic activity. Earthquake databases (the Council of the National Seismic System Composite Catalogue and the Southern Great Basin Seismic Network) provide current and historical earthquake information. Analysis of the available data in 1996 indicates that, since 1976, there have been 621 seismic events of magnitude greater than 2.5 within a 50-mile (80Â km) radius of Yucca Mountain.
DOE has stated that seismic and tectonic effects on the natural systems at Yucca Mountain will not significantly affect repository performance. Yucca Mountain lies in a region of ongoing tectonic deformation, but the deformation rates are too slow to significantly affect the mountain during the 10,000-year regulatory compliance period. Rises in the water table caused by seismic activity would be, at most, a few tens of meters and would not reach the repository. The fractured and faulted volcanic tuff that Yucca Mountain comprises reflects the occurrence of many earthquake-faulting and strong ground motion events during the last several million years, and the hydrological characteristics of the rock would not be changed significantly by seismic events that may occur in the next 10,000 years. The engineered barrier system components will reportedly provide substantial protection of the waste from seepage water, even under severe seismic loading.
In September 2007, it was discovered that the Bow Ridge fault line ran underneath the facility, hundreds of feet east of where it was originally thought to be located, beneath a storage pad where spent radioactive fuel canisters would be cooled before being sealed in a maze of tunnels. The discovery required several structures to be moved several hundred feet further to the east, and drew criticism from Robert R. Loux, then head of the Nevada Agency for Nuclear Projects, who argues that Yucca administrators should have known about the fault line's location years prior, and called the movement of the structures âjust-in-time engineering.â In June 2008, a major nuclear equipment supplier, Holtec International, criticized the Department of Energy's safety plan for handling containers of radioactive waste before they are buried at the proposed Yucca Mountain dump. The concern is that, in an earthquake, the unanchored casks of nuclear waste material awaiting burial at Yucca Mountai n could be sent into a "chaotic melee of bouncing and rolling juggernauts".
Transportation of waste
The nuclear waste was planned to be shipped to the site by rail and/or truck in robust containers known as spent nuclear fuel shipping casks, approved by the Nuclear Regulatory Commission. While the routes in Nevada would have been public, in the other states the planned routes, dates and times of transport would have been secret for security reasons. State and tribal representatives would have been notified before shipments of spent nuclear fuel enter their jurisdictions.
Nevada routes
Within Nevada, the planned primary mode of transportation was via rail through the Caliente Corridor. This corridor starts in Caliente, Nevada, traveling along the northern and western borders of the Nevada Test Site for approximately 200 miles (320Â km). At this point, it turns south.
Other options that were being considered included a rail route along the Mina corridor. This rail route would have originated at the Fort Churchill Siding rail line, near Wabuska. The proposed corridor would have proceeded southeast through Hawthorne, Blair Junction, Lida Junction and Oasis Valley. At Oasis Valley, the rail line would have turned north-northeast towards Yucca Mountain. Use of this rail corridor by the Department of Energy would have required permission from the Walker River Paiute Tribe in order to cross their land. As the first 54 miles (87Â km) of the proposed corridor was owned by the Department of Defense, additional permission from the DoD would have to have been granted.
Impacts
Since the early 1960s, the U.S. has safely conducted more than 3,000 shipments of spent nuclear fuel without any harmful release of radioactive material. This safety record is comparable to the worldwide experience where more than 70,000 metric tons of spent nuclear fuel have been transported since 1970 â" an amount approximately equal to the total amount of spent nuclear fuel that would have been shipped to Yucca Mountain. However, cities were still concerned about the transport of radioactive waste on highways and railroads that may have passed through heavily populated areas. Dr. Robert Halstead, who was a transportation adviser to the state of Nevada since 1988, stated regarding transportation of the high level waste, "They would heavily affect cities like Buffalo, Cleveland, Pittsburgh, in the Chicago metropolitan area, in Omaha." "Coming out of the south, the heaviest impacts would be in Atlanta, in Nashville, St. Louis, Kansas City, moving across through Salt Lake City, th rough downtown Las Vegas, up to Yucca Mountain. And the same cities would be affected by rail shipments as well." Spencer Abraham (DOE) on the other hand has stated, "I think there's a general understanding that we move hazardous materials in this country, an understanding that the federal government knows how to do it safely."
Cultural impact
Archaeological surveys have found evidence that Native Americans used the immediate vicinity of Yucca Mountain on a temporary or seasonal basis. Some Native Americans disagree with the conclusions of archaeological investigators that their ancestors were highly mobile groups of hunter-gatherers who occupied the Yucca Mountain area before Euroamericans began using the area for prospecting, surveying, and ranching. They believe that these conclusions overlook traditional accounts of farming that occurred before European contact.
Yucca Mountain and surrounding lands were central in the lives of the Southern Paiute, Western Shoshone, and Owens Valley Paiute and Shoshone peoples, who shared them for religious ceremonies, resource uses, and social events.
Crosby and Nash wrote a 2004 song Don't Dig Here protesting against the environmental issues associated with the project.
Delays since 2009
Since 2009, the Obama administration has been attempting to close the Yucca Mountain repository, despite current US law that designates Yucca Mountain as the nation's nuclear waste repository. The administration agency, DOE, began implementation of the President's plan in May 2009. The Nuclear Regulatory Commission has also gone along with the administration's closure plan. Various state and Congressional entities have attempted to challenge the administration's closure plans, by statute and in court. Most recently, in August 2013, a US Court of Appeals decision has told the NRC and the Obama administration that they must either "approve or reject the Energy Department's application for [the] never-completed waste storage site at Nevada's Yucca Mountain." They cannot simply make plans for its closure in violation of US law.
In May 2009, then United States Secretary of Energy Steven Chu stated:
"Yucca Mountain as a repository is off the table. What we're going to be doing is saying, let's step back. We realize that we know a lot more today than we did 25 or 30 years ago. The NRC is saying that the dry cask storage at current sites would be safe for many decades, so that gives us time to figure out what we should do for a long-term strategy. We will be assembling a blue-ribbon panel to look at the issue. We're looking at reactors that have a high-energy neutron spectrum that can actually allow you to burn down the long-lived actinide waste. These are fast-neutron reactors. There's others: a resurgence of hybrid solutions of fusion fission where the fusion would impart not only energy, but again creates high-energy neutrons that can burn down the long-lived actinides. ...
"Some of the waste is already vitrified. There is, in my mind, no economical reason why you would ever think of pulling it back into a potential fuel cycle. So one could well imagineâ"again, it depends on what the blue-ribbon panel saysâ"one could well imagine that for a certain classification for a certain type of waste, you don't want to have access to it anymore, so that means you could use different sites than Yucca Mountain, such as salt domes. Once you put it in there, the salt oozes around it. These are geologically stable for a 50 to 100 million year time scale. The trouble with those type of places for repositories is you don't have access to it anymore. But say for certain types of waste you don't want to have access to it anymoreâ"that's good. It's a very natural containment. ...whereas there would be other waste where you say it has some inherent value, let's keep it around for a hundred years, two hundred years, because there's a high likelihood we'll come back to it and want to recover that.
"So the real thing is, let's get some really wise heads together and figure out how you want to deal with the interim and long-term storage. Yucca was supposed to be everything to everybody, and I think, knowing what we know today, there's going to have to be several regional areas."
In 2008, the U.S. Senate Committee on Environmental and Public Works found that failure to perform to contractual requirements could cost taxpayers up to $11 billion by 2020. In 2013 this estimate of taxpayer liability was raised to $21 billion. In July 2009, the House of Representatives voted 388 to 30 on amendments to HHR3183 (Roll call vote 591, via Clerk.House.gov) to not defund the Yucca Mountain repository in the FY2010 budget. In 2013, the House of Representatives voted twice during the 2014 Energy and Water Appropriations debate by over 80% majority to reject elimination of Yucca Mountain as the nation's only nuclear waste solution.
On April 13, 2010, the state of Washington filed suit to prevent the closing of Yucca Mountain, since this would slow efforts to clean up Hanford Nuclear Reservation. South Carolina, Aiken County (the location of Savannah River site) and others joined Washington. The United States Court of Appeals for the District of Columbia Circuit dismissed the suit in July 2011, saying the Nuclear Regulatory Commission had not ruled on the withdrawal of the license application. Washington and South Carolina filed another lawsuit on July 29.
With $32 billion received from power companies to fund the project, and $12 billion spent to study and build it, the federal government had $27 billion left, including interest. In March 2012, Senator Lindsey Graham introduced a bill requiring three-fourths of that money to be given back to customers, and the remainder to the companies for storage improvements.
In August 2013, the U.S. Court of Appeals for the District of Columbia ordered the Nuclear Regulatory Commission to either "approve or reject the Energy Department's application for [the] never-completed waste storage site at Nevada's Yucca Mountain." The court opinion said that the NRC was "simply flouting the law" in its previous action to allow the Obama administration to continue plans to close the proposed waste site since a federal law designating Yucca Mountain as the nation's nuclear waste repository remains in effect. The court opinion stated that "The president may not decline to follow a statutory mandate or prohibition simply because of policy objections."
In pop culture
- In the 1995 film Carnosaur 2, dinosaur eggs hatch inside the repository and wreak havoc on the facility, which ultimately suffers a containment failure and explodes.
- In the 2014 American science fiction monster film Godzilla, the Yucca Mountain waste repository is used to store a mysterious radioactive pod that is revealed to be the egg of an enormous monster. It then hatches, escapes Yucca Mountain and causes havoc in the monster movie tradition.
0 komentar: